On June 6, 2026, the daily solar generation was 2.51 kWh.
Generation
The peak power reached 926 W at 11:00. This is 24% of the nominal 3840 W. The average power during generation was 188 W.
Operating Duration
Generation started at 06:00 and ended at 19:40. The total operating duration of the solar panels was 13 hours 40 minutes.
6.44 kWh was received from the grid during the day.
6 TWMNH-66HD640 panels of 640 W are installed vertically on the south wall in the Ivano-Frankivsk region.
Description of the station configuration and data collection automation.
This post doesn't have any additions from the author yet.