All original content is created in Ukrainian. Not all content has been translated yet. Some posts may only be available in Ukrainian.Learn more

June 10, 2026 Solar Report

Table of contentsClick link to navigate to the desired location
This content has been automatically translated from Ukrainian.

On June 10, 2026, the daily solar generation was 7.83 kWh.

Generation

The peak power reached 1586 W at 13:45, which is 41% of the nominal 3840 W. The average power during generation was 531 W.

Operating Duration

Generation started at 05:55 and ended at 20:40. The total operating duration of the solar panels was 14 hours 45 minutes.

10.99 kWh was received from the grid during the day.

6 panels TWMNH-66HD640 of 640 W are installed vertically on the south wall in the Ivano-Frankivsk region.

Description of the station configuration and data collection automation.

This post doesn't have any additions from the author yet.

Jun 5, '26 11:21

June 4, 2026 Solar Report

Jun 8, '26 10:04

June 5, 2026 Solar Report

Jun 8, '26 10:04

June 6, 2026 Solar Report

Jun 9, '26 12:29

June 7, 2026 Solar Report

Jun 9, '26 12:29

June 8, 2026 Solar Report

Jun 10, '26 13:45

June 9, 2026 Solar Report